CKD Proton e.Mas 5 coming soon as Proton doubles BEV production in Tanjong Malim with RM 37m upgrades
Local assembly (CKD) of the Proton e.Mas 5 is set to begin soon, as the company initiates a RM 37 million expansion of its electrified vehicle assembly plant at the Automotive High-Tech Valley (AHTV) in Tanjong Malim.